This striking refurbishment project, located on the Hove seafront, was completed by CSW Cladding Ltd on a design, supply and installation basis. Works comprised of renewed balcony fascias and soffits, with matching window surrounds throughout the facade. The project was delivered on behalf of Trinity Homes Ltd.
Project Completed: Q3 2021
Project Value: £200,000 to £250,000
1 of 7
An APS Downer DCS031 Subframe was utilised throughout the project with fire strategy requirements achieved using Rockwool SP 60 and OSCB Firestop. Rockpanels Metallics FS Rainscreen completed the facade.