Completed on a design, supply and installation basis for McCarthy & Stone. The project utilised a hard wearing fibre cement panel with a natural finish, installed to the upper floors to contrast the traditional brickwork facade for the new-build residential building.
Project Completed: 2024
Project Size: 180m2
1 of 4
The SVK Colourmatt fibre cement panels were mounted on a high pressure treated timber subframe. The project fire strategy requirements were met using Tenmat's Non Ventilated Fire Barrier and FF102/50 Ventilated Cavity Fire Barrier.