LEWES ROAD BRIDGE, BRIGHTON
This design supply and installation project provided a distinctly modern finish to an overbridge installed as part of pedestrian access improvements between Brighton University buildings. The Invisibly fixed PPC aluminium panels utilised a head wearing low maintenance coating, designed to allow the installation of complimentary down lighting.
Project Completed: 2022
Project Size: 177m2