The renewed rainscreen installation comprised of: Y-Wall sheathing sealed with Rockwool Acoustic Sealant, Photonwrap A1 Breather Membrane and Vitrafix VF1 Subframe System. The facades fire strategy requirements were achieved using AIM OSCB 60/44 and AIM 1HR Cavity Barrier Slab Fire Barrier with Rockwool Rainscreen Duoslab insulation installed throughout. The final rainscreen was a rivet fixed Installation of Vitradual 3mm Aluminium Rainscreen Cladding.

If you would like to work with us or make an enquiry, call 02382 148588 or get in touch. contact us