The facade renewal utilised Tyvek Firecurb membrane with a Plastestrip Fastframe subframe system and Siderise RH25 90/30 & RV 90/30 cavity fire barriers. Insulation was achieved using Rockwool Rainscreen Duoslab with the rainscreen panels comprising of Marley Tectiva and Linea
Similar Projects